Process
Six steps. No second contractor.
The sale happens on the roof, not in the inbox. We still want 45 minutes on site even if the builder already gave you a number.


01
Bill, photos, a conversation
Nine-step builder or a call. Switchboard photo beats a novel.
02
Same-morning call
Lachlan or the crew — not a call centre. After 5 pm we ring at 7:30 am.
03
Roof + board, 45 min
Shading, structure, the switchboard. Both decision-makers if it is a joint account.
04
Written price, one business day
STCs assigned. Board as its own line. Vic or NSW path, not a portal homework sheet.
05
Deposit, then install
Typical 10% to lock stock. Our electricians. One to two days on a standard house.
06
CoES, then we stay on the phone
Certificate of Electrical Safety, monitoring if you want it. Lifetime workmanship on the labour.
What happens after you book
- 01NowThis request is on our desk. After 5 pm we ring at 7:30 am. Have the last bill handy.
- 02Same morningA call from Lachlan or the crew — not a call centre.
- 03Roof + board, 45 minShading, structure, the switchboard. Both decision-makers if it is a joint account. Board photo beforehand saves time.
- 04Written price, one business daySTCs assigned. Board as its own line. Solar Vic paperwork we prepare.
- 05Deposit to lock stockTypical 10%. Price holds 14 days. Not finance games.
- 06InstallOne to two days on a standard house. Commissioned, monitored, CoES. We stay on the phone.
